EN
CN
新闻资讯

新闻资讯

News CenterNews

Cost optimization strategy for cold-rolled ribbed steel mesh

2025-04-19 14:26:57
3times

1. Analysis of the cost structure of the whole cycle

Purchase cost: affected by raw materials and production process


Transportation cost: about 8-12% of total expenditure


Construction cost: including paving efficiency and rework risk


Maintenance cost: directly related to material durability


2. Implementation path of cost control

Link Common problems Optimization plan

Purchase Improper specification selection Joint design institute optimization selection

Logistics Multiple transit losses Choose direct dedicated line transportation

Construction Low paving efficiency Use standardized installation tool kit

Maintenance Early rust Establish a regular inspection system

3. Supplier cooperation suggestions

Sign a framework agreement to lock in preferential prices


Require suppliers to provide transportation loss compensation plan


Establish a joint inventory management model to reduce capital occupation


Related news

  • menu
Powered by Xiangyun Platform Technical Support: aujet
#
在线客服

x