1. Standardized installation process
Foundation construction:
Embedded depth ≥40cm, concrete grade ≥C25
Column spacing ≤2.5m, vertical deviation <3mm/m
Component installation:
The beam and column are fixed with anti-disassembly bolts
The installation height of the reflector is 60-80cm from the ground
2. Solutions to common problems
Problem type Cause analysis Treatment plan
Guardrail tilt Uneven foundation settlement Add diagonal brace reinforcement
Coating peeling Transport bump/corrosion Local grinding and zinc paint spraying
Bolt loosening Vibration caused Regular inspection and replacement of anti-loosening nuts