EN
CN
新闻资讯

新闻资讯

News CenterNews

Beijing-style guardrail construction, installation and maintenance specifications

2025-04-19 14:56:33
times

1. Standardized installation process

Foundation construction:


Embedded depth ≥40cm, concrete grade ≥C25


Column spacing ≤2.5m, vertical deviation <3mm/m


Component installation:


The beam and column are fixed with anti-disassembly bolts


The installation height of the reflector is 60-80cm from the ground


2. Solutions to common problems

Problem type Cause analysis Treatment plan

Guardrail tilt Uneven foundation settlement Add diagonal brace reinforcement

Coating peeling Transport bump/corrosion Local grinding and zinc paint spraying

Bolt loosening Vibration caused Regular inspection and replacement of anti-loosening nuts


Related news

  • menu
Technical Support: aujet
#
在线客服

x