1. On-site operation specifications
Storage management:
Store overhead to avoid moisture erosion on the ground
Different specifications should be stacked in different areas and marked
Laying requirements:
The overlap length should meet the requirement of 30 times the diameter of the steel bar
Fix with special fasteners, with a spacing of no more than 50cm
2. Solutions to common problems
Mesh deformation: Choose standard parts directly supplied by the manufacturer to reduce secondary handling
Loose nodes: Prioritize the purchase of mesh produced by resistance welding process
Corrosion hazards: Require suppliers to provide anti-corrosion treatment that meets environmental requirements
3. Supplier service support
High-quality suppliers usually provide:
Free construction plan consultation
On-site paving technical guidance
Emergency replenishment green channel